We developed the project jointly with ABB and set out a paint system consisting of:
• 2 Iso-Flo systems with an electrostatic generator
• 2 anthropomorphic robots
• 2 mixed air paint guns
To satisfy Smit's primary demands for
paint saving, we reviewed the performance levels of the proposed technologies versus those used and presented the quotation as enclosed, based on the assumption of 35µ coverage, as requested, versus 45µ, thus difficult to measure. Jointly with ABB, we analysed the main steps of the painting programme and reaches the conclusion that an average frame could be painted in 25’ versus present 40’,
thereby minimising cycle times.
Today, Smit Textile SpA automatically paints machinery in an average 25’ and cuts paint consumption by 35%, thereby simultaneously improving coverage and distension.