The installation was modified as follows to apply base and water soluble 2k finish:• Acclimatised semi-vertical flow paint cab replaced
• Oven replaced with new forced laminar flow one
• Painting system replaced with painting robot interfaced Plc Siemens electronic management system
• Electrostatic system insulated for water-soluble materials