From Moto Sprint, 8/14 Sept. 2009 To refresh the box - AIR CONDITIONING ACCORDING TO HAYATE
THE TEAM Hayate made use of a new air conditioning system inside the box to face Misano hot temperatures. The system works through a series of very small nozzles which nebulise water and turn it into microscopic molecules. The temperature inside the box can then be reduced up to 12 degrees without wetting anything. Surely enough, the system will be very useful in Malaysia, in October.

 






 
Imola SBK is cooler with ECO Refresh
24/09/2009. Another successful strike for ECO Refresh!
GL...[ Read News...]
Rinco Noleggi and ECO Refresh together at La Bagnaia 2009
One of the most important events of the equestrian world has started on 16th September 2009: the Campionato Italiano Assoluto di...[ Read News...]
Big discount on ECO Refresh!
It is a great pleasure for us to share the wave of success ridden by the event which we actively supported in occasion of the Concorso Ippico...[ Read News...]
The success of ECO Refresh at MotoGP Misano 2009
6th September 2009. A further goal reached by GL Finishing and ECO Refresh at MotoGP...[ Read News...]
ECO Refresh at MotoGP Misano 2009
From the horses’s speed ECO Refresh lands on the field of horsepowers, those of MotoGP Misano 2009.[ Read News...]
GL Finishing S.r.l. | Via dei Fonditori, 10b | 41122 Modena | t. +39 059 289911 | f. +39 059 284615 | P.Iva e CF 01852620366 | info@glfinishing.com         Web Design © Macstudio.it